Built to help voters quickly verify how officials vote — district first, party second. All information is sourced from official public records.
HR. 1047 · 119th Congress

GRID Power Act

In committee

This bill has not become law. Status shown reflects the latest official action.

See what this could mean for your district

Save your district in Account to view district-specific context for this bill.

Bill details

Introduced: 2/6/2025
Status: Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
Bill ID: 119hr1047
Latest action: Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

Summary

Introduced in House

Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power Act This bill requires the Federal Energy Regulatory Commission (FERC) to issue a rule that revises the prioritization and approval process for interconnection requests for dispatchable power projects. (Under the bill, d ispatchable power generally refers to an an electric energy generation resource capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability.) First, the rule must address the efficiency and effectiveness of the existing procedures for processing interconnection requests for new dispatchable power projects to ensure that new projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably. Second, the rule must revise the pro forma Large Generator Interconnection Procedures, and the pro forma Large Generator Interconnection Agreement as appropriate, to authorize transmission providers to submit proposals to FERC to adjust the interconnection queue of the provider to prioritize new dispatchable power projects that will improve grid reliability and resource adequacy by assigning those projects a higher positions in the queue. FERC must review and approve or deny such proposals within 60 days after the proposal is submitted.

Source: BILLSUM · Summary date: 2/6/2025

District impact notes

1 notes
NEUTRAL
3/16/2026

The GRID Power Act requires the Federal Energy Regulatory Commission to revise the interconnection process for dispatchable power projects to improve efficiency and reliability. • This change could help local energy projects connect to the electric grid more quickly, potentially enhancing energy reliability in the district. • Local institutions and employers may benefit from improved access to reliable electricity, which could support various activities and services. • There may be questions about how effectively the new prioritization system will balance the needs of different types of energy projects and the existing infrastructure. AI-generated from official bill summary and plain-English note; verify with official text.

Related votes

Roll calls that reference this bill in official data.

0 roll calls
No related roll calls found yet for this bill.

Primary sources

Official links to verify details. (No interpretation.)

Summary source label: BILLSUM
About this data
  • OurCongress is non-partisan by design. We do not add political interpretation or advocacy.
  • Bill data and official summaries come from GovInfo and Congress.gov. Some bills do not have published summaries yet.
  • District impact notes (when shown) are AI-generated from official bill metadata/summaries to improve readability. They are not official government language.
  • This page updates automatically via a daily ingestion pipeline.

About this data

Non-partisan by design
OurCongress provides plain-English context without endorsements, political interpretation, or advocacy.
Official sources
Data is sourced from official government records (e.g., Congress.gov, GovInfo, Clerk of the House, and the U.S. Senate).
AI-generated text
Some sections may be AI-generated from official summaries/metadata to help readability. AI output can be imperfect—verify with primary sources.
Last updated: 3/16/2026Source: BILLSUMBill: 119hr1047Learn more →